Uncategorized Archives - Page 3 of 7 - Naturavita

FIRST YEAR OF IMPLEMNTATION OF PROJECT ACTIVITES FOR GROUP 1: MONITORING OF ECOLOGICAL STATUS OF SURFACE WATERSAND MONITORING OF ADDITIONAL BIOLOGICAL INDICATORS AND GROUP 2: MONITORING OF CHEMICAL STAUS OF SURFACE WATERS

The twelfth sampling within the Naturavita project for Group 1: Monitoring of ecological status of surface waters and monitoring of additional biological indicators and for Group 2: Monitoring of chemical status of surface waters has just been completed. Concluding with this sampling in June 2021, the first year of sampling of three as long as

Read More...

MACROZOBENTOS RESEARCH

Since July 2020, systematic field and laboratory research of macrozoobenthos has been carried out as part of the activities of the project Monitoring of water, groundwater, recent sedimentation, habitats and fauna – GROUP 1: Monitoring of ecological status of surface waters and monitoring of additional biological indicators. Researchers from the Faculty of Science, University of

Read More...

PIEZOMETER FIELD TOUR

At the end of April 2021, a field tour of the investigative piezometers was carried out, on which the activities of Group 3 will be carried out: : Groundwater monitoring (quantitative and chemical status) within the Naturavita project. The implementation of chemical condition monitoring is carried out on 5 piezometers, at monthly intervals over a

Read More...

FIRST SAMPLING OF PIEZOMETERS

On May 18, 2021, the first field sampling of groundwater was performed on exploratory piezometers within the Naturavita project, Group 3: Groundwater monitoring (quantitative and chemical status). During the monitoring, physico – chemical indicators, basic cations and anions, metals, organophosphorus pesticides and triazine pesticides are determined on 5 piezometers. Sampling was performed by representatives of

Read More...

27.67 km OF FIRE BREAKS WITH ELEMENTS OF THE FOREST ROAD HAVE BEEN BUILT IN THE PROJECT AREA UNTIL NOW

The activity of restoration and construction of forest fire-fighting infrastructure contributes to the achievement of Specific Objective 3: Improve the protection of forests and forest land in the Naturavita project area and mitigate the negative impacts of biotic and abiotic factors on forest ecosystems.  The implementation of this activity will provide active fire protection, especially

Read More...

Habitat And Flora Monitoring Has Started

Within Activity 7.2. of the NATURAVITA project: Implementation of research works, establishment of a system and implementation of monitoring, with interpretation of results, ie project task: Monitoring and research service for the purpose of preparing a study of the revitalization of aquatic ecosystems of the floodplain of the Kopački rit Nature Park, the implementation of

Read More...

Otter (Lutra lutra) and Beaver (Castor fiber) Monitoring

Monitoring of otters (Lutra lutra) and beavers (Castor fiber), the main indicator species of mammals of aquatic and wetland habitats, is carried out within the activities of the NATURAVITA project, in order to obtain data on the status of these wild species and the quality of their habitats. The obtained data will be one of

Read More...

TV report about Naturavita on Portuguese public television

The quality and importance of the strategic project “Demining, Reconstruction and Protection of Forests and Forest Land in Protected and Natura 2000 Areas in the Danube-Drava Region – NATURAVITA” was recognized by the editor of Portuguese Public Television, Raquel Morao Lopes. Raquel and her cameraman visited the project area on October 7 and 8, 2020,

Read More...

Exploratory Piezometer Boreholes

Within Activity 7.2. Naturavita project – Implementation of exploration works, establishment of the system and implementation of monitoring, with interpretation of results, drilling of exploration-piezometric boreholes in the area of Kopački Rit Nature Park 10 exploration boreholes, 9 shallow boreholes and 1 deep borehol, were drilled. Eight shallow boreholes were drilled by the direct drilling

Read More...

50 Measuring Columns For Recent Sedimentation Have Been Installed

Within Activity 7.2. Naturavita project – Implementation of exploration works, establishment of a system and monitoring, with interpretation of results, Research and monitoring of recent sedimentation in the area of Kopački rit Nature Park, 50 measuring columns for recent sedimentation in order to monitor how much alluvial sediment is deposited in certain areas, and how

Read More...